Comprehensive Analysis of Software Metrics and
Project Estimation Techniques
Introduction
Estimating software project parameters is a critical aspect of project planning, helping to
determine project size, effort, duration, and cost. This document synthesizes various
perspectives on software metrics and estimation techniques, offering a detailed
understanding of the available methodologies, their advantages, and inherent
limitations.
Software Metrics for Project Size Estimation
Lines of Code (LOC)
● Definition: Measures project size by counting the number of source instructions
in the developed program.
● Advantages:
● Simple to use and widely understood.
● Easier to measure at the end of the project.
● Disadvantages:
● Inaccuracy in Early Stages: Difficult to estimate at the project's outset.
● Varies with Coding Style: Different programmers may produce varying
LOC for the same functionality.
● Quality and Efficiency: Does not correlate well with code quality or
efficiency. Poorly written code might have a higher LOC.
● Penalizes Higher-Level Languages and Code Reuse: LOC count
reductions due to the use of libraries or high-level languages might
misrepresent productivity.
Function Point (FP) ● Definition: Proposed by Albrecht (1983), this metric estimates project size based
on the number of functionalities supported by the system.
● Calculation:
● Involves counting inputs, outputs, user inquiries, files, and interfaces.
● Adjusts with technical complexity factors such as high transaction rates
and performance requirements.
● Advantages:
● Early Estimation: Can be estimated from the problem specification before
development begins.
● Comprehensive Measurement: Accounts for more aspects of software
beyond just the number of lines of code.
● Disadvantages:
● Algorithmic Complexity: Does not consider the varying effort required for
functionalities of different complexities.
Feature Point (FP)
● Enhancement to Function Point: Incorporates an extra parameter for algorithm
complexity, providing a more accurate representation of the effort needed for
complex functionalities.
Project Estimation Techniques
Empirical Estimation Techniques
Empirical techniques rely on educated guesses based on prior experience with similar
projects. They are grounded in common sense but have been formalized over time.
Expert Judgment Technique
● Process: Experienced professionals estimate project parameters based on their
analysis.
● Refinement: Group estimates can minimize biases and oversights. ● Drawbacks: Subject to human error and varying levels of familiarity with different
project aspects.
Delphi Cost Estimation
● Process: A team of experts provides anonymous estimates iteratively, with a
coordinator compiling and summarizing the results.
● Benefit: Reduces individual biases and the influence of dominant personalities.
Heuristic Techniques
Heuristic models use mathematical expressions to describe relationships between
project parameters. They can be single-variable or multi-variable models.
Single-variable Models
● Form: Estimated Parameter = (c_1 \times e^{d_1})
● Example: The basic COCOMO model, which predicts cost based on project size.
Multi-variable Models
● Form: Estimated Resource = (c_1 \times e_1^{d_1} + c_2 \times e_2^{d_2} +
\ldots)
● Advantage: Provide more accurate estimates by considering multiple influencing
factors.
Analytical Estimation Techniques
Analytical techniques derive estimates from basic assumptions about the project,
offering a scientific basis for estimation.
Example: Halstead’s Software Science
● Approach: Uses predefined mathematical formulations to derive key project
parameters.
Conclusion Accurate project estimation is a blend of various techniques, each with its strengths and
weaknesses. Metrics like LOC and FP provide foundational measures, while estimation
techniques from empirical and heuristic to analytical offer different approaches to
refining these estimates. Understanding and judiciously applying these methods is
crucial for effective project planning and management .
Comprehensive Analysis of Software Metrics and Project Estimation Techniques
of 4
Report
Tell us what’s wrong with it:
Thanks, got it!
We will moderate it soon!
Free up your schedule!
Our EduBirdie Experts Are Here for You 24/7! Just fill out a form and let us know how we can assist you.
Take 5 seconds to unlock
Enter your email below and get instant access to your document